Glad2BHome

Improve

Planning a Bathroom Remodel

Bathrooms are small, wet, and unforgiving. What is behind the tile matters more than the tile.

Fact-checked and reviewed by a licensed general contractor by Tomas Garrity. Read our content review process.

Illustration: a bathroom with a vanity, round mirror, tiled wall and a freestanding tub — accompanying “Planning a Bathroom Remodel”.
Original Glad2BHome illustration. Improve.

A bathroom is the densest room in a house: plumbing, electrical, ventilation, and waterproofing in forty square feet. Most bathroom failures are waterproofing failures, and they show up years later as rot in the framing below.

Get the invisible parts right

  • A continuous waterproofing system in the shower — sheet or liquid membrane, properly lapped, not just cement board
  • Correct slope to the drain, verified before tile goes down
  • A proper pre-slope under any traditional mortar bed
  • Blocking in the walls for grab bars, now, even if you install them later
  • An exhaust fan sized to the room and ducted to the outside, never into the attic
  • GFCI protection on all outlets
  • Water-resistant backer board rather than standard drywall in wet areas

Layout realities

Plumbing location drives cost. Moving a toilet requires relocating a three-inch drain and often opening the floor below; moving a vanity is comparatively easy. In small bathrooms, converting a tub to a curbless shower can dramatically improve usable space and accessibility, but requires floor structure that can accommodate the drop.

Budget ranges

Bathroom project levels
LevelTypical costWhat it includes
Cosmetic refresh$3,000 – $8,000Paint, fixtures, mirror, light, toilet, vanity swap
Mid-range remodel$15,000 – $30,000New tile, tub or shower, vanity, flooring, fan, same layout
Full remodel with layout change$30,000 – $60,000+Moved plumbing, structural work, custom tile and glass

Where to spend

  • Waterproofing and the shower pan — the one place where failure is catastrophic
  • A quality exhaust fan, quiet enough that people actually run it
  • A well-made faucet and shower valve from a brand with available replacement cartridges
  • Comfortable lighting at the mirror, from both sides rather than overhead only

Where to save

  • Large-format simple tile instead of intricate mosaic, which is labor-intensive to install
  • A stock vanity with an upgraded top
  • Standard toilets from major manufacturers — performance is excellent at moderate prices
  • Keeping the existing layout

Frequently asked questions

How long does a bathroom remodel take?

Three to six weeks for a standard remodel, longer if plumbing moves or if custom glass and tile are involved.

Do I need a permit for a bathroom remodel?

Almost always if plumbing or electrical changes. A pure cosmetic swap often does not. Confirm with your building department.

Is a tub necessary for resale?

Having at least one tub in the home is generally advisable for families with young children. Converting a secondary bathroom's tub to a shower is usually fine.

Next step

Energy Efficiency Upgrades Ranked by Payback

Efficiency upgrades

Read next

About the author

Corinne Hale — Editor, Improvement & Design. Corinne Hale writes about renovation planning, budgets, and the gap between a design idea and a finished room. She has documented dozens of remodels from first sketch through final punch list. NKBA associate member; former design-build project coordinator.

Our editorial standards

Related reading

Illustration: a kitchen with base and wall cabinets, a range hood, pendant lights and a fruit bowl — accompanying “Planning a Kitchen Remodel”.

Improve

Planning a Kitchen Remodel

Kitchens are the most expensive room per square foot in a house. Here is how to plan one so the money lands where you will notice it.

Improve2 min readUpdated June 2, 2026

Illustration: a room mid-renovation with a stepladder, open wall studs and a paint roller — accompanying “How to Plan a Home Renovation Budget”.

Improve

How to Plan a Home Renovation Budget

Renovations rarely go over budget for mysterious reasons. Here is where the money actually goes, and how to build a number you can hold…

Improve3 min readUpdated June 21, 2026

Illustration: a room mid-renovation with a stepladder, open wall studs and a paint roller — accompanying “How to Hire a Contractor You Can Trust”.

Improve

How to Hire a Contractor You Can Trust

The contractor you choose matters more than any material you select. Here is how to vet one properly, and what belongs in the contract.

Improve3 min readUpdated May 18, 2026